State Route 178

Landslide on State Route 178 in Lee County

An emergency project to repair a landslide on State Route 178 was awarded to Century Construction & Realty Inc. for $980,157. A portion of the highway between State Route 371 and Treeside Drive near Mooreville was closed after heavy rains saturated the shoulder slope and caused a landslide.

To repair the highway, MDOT drove piles along the slide to help stabilize the shoulder slope. Once the soil is stabilized, crews will repair the roadbed and apply a new lift of asphalt. A four-mile detour will remain in place from State Route 371 to Interstate 22 to Eason Boulevard throughout the duration of this emergency repair project.

IMG_3012
IMG_3013
IMG_3061
//

Thompson CAT Sitework

Century Construction delivered heavy construction services for the Thompson CAT Sitework (Wallace Drive & Utilities) project in Belden Mississippi. The contract amount was $1,403,500 and included mass excavation, borrow fill, stonework, and drainage for the new 42,000 sq ft facility. The project included site utilities, soil-cement, and asphalt paving for the new 3/4 mile long road.

//

Kings Crossing Sitework

The Kings Crossing project included sitework and drainage in our Heavy Construction division. The contract amount was $805,540. The project included drainage and parking lot paving, driveway paving, and multiple buildings anchored by Kohl’s department store and up to 15 additional stores.

//

Army Aviation Support Facility

Century Construction Group served as the subcontractor to Worsham Brothers, Inc. for the Army Aviation Support Facility in Tupelo, Mississippi. The contract amount was $2,702,586 and included all necessary site work, utilities, and drainage for the new $30 million,105,000 square foot facility on 39 acres. The project also included mass excavation and grading work.

//

Smith County Landfill

Century Construction delivered heavy construction services to the Smith County Landfill project in Carthage, Tennessee. The completion time was 6 months and the contract amount was $1,895,000 The Class 1 Wright Tract 2 project included:

• 150,000 cy of cell excavation
• 45,000 cy of clay liner and reconstructed buffer
• 25 tons of gravel drainage layer
• Includes leachate system and 7,000 sf of HDPE membrane & geocomposite drainage layer

//

Winston Medical Center Demolition

Winston Medical Center Demolition

Century Construction provided demolition services for Winston Medical Center in Louisville, Mississippi. The contract amount was $804,967 and it included the following.

  • Demolition of the existing hospital, nursing home wing A, outpatient services building, maintenance buildings, and medical clinic building.
  • Demolition of paving, walks, retaining walls, site utilities, and storm drainage systems.
  • Grading of the site to ensure positive drainage and compliance with SWPPP.
  • Erosion controls as required by MDEQ.
  • Construction and maintenance of a haul road for the project duration.
  • Crushing and stockpiling of concrete, brick, and CMU.
  • Demolition of foundations and below-grade construction and backfill/compaction of same as required to achieve smooth grade and positive drainage.
  • Grading of entire demolition site Provide and install a new domestic water.