Century Construction delivered heavy construction services for the Thompson CAT Sitework (Wallace Drive & Utilities) project in Belden Mississippi. The contract amount was $1,403,500 and included mass excavation, borrow fill, stonework, and drainage for the new 42,000 sq ft facility. The project included site utilities, soil-cement, and asphalt paving for the new 3/4 mile long road.